Data center Specifications
 
 
Our data center is strategically located in the heart of Broward County. The 66,000 square-foot facility equipped with fully armed security and office facilities, incorporates a 22,000 square-foot, 18" raised floor data center with full 9 foot ceiling height. Conveniently located between I-95 and Florida's Turnpike, just off Commercial Blvd. makes our center accessible from the Tri-county region.
 
The 1Vault Networks Data Center is built to the highest standards to ensure the integrity of your business and is manned by highly skilled professionals who are dedicated to providing you with the highest quality and most reliable services available today.
  .Facility  
 
 
Constructed to withstand category 5 hurricane force winds 62,000sf total, 22,000sf raised floor Rack based colocation in full 45U cabinets Rack based colocation in half cabinets Cage based colocation in 8ft x 8ft, 8ft x 16ft, or custom sizes N+1 FPL Utility power feeds N+1 UPS redundancy (1.5 Megawatts) N+1 Generators (3.75 Megawatts) N+1 Redundant chillers for A/C
.Network    
 
 
 
Fully redundant infrastructure Force10 E600 core devices Cisco GSR 12000 edge devices Diverse fiber entry points Tier-1 Bandwidth Providers NTT/Verio Level(3) Qwest
  .Security  
 
 
 
 
Biometric scanners Card access control 24/7/365 Armed on-site security 24/7/365 intrusion detection monitoring Surveillance cameras
  .AC Power Systems  
 
 
N+1 FPL Utility power feeds N+1 Leibert PDUs N+1 UPS redundancy (1.5 Megawatts)
   
.Power Generator  
   
N+1 Generators (3.75 Megawatts) 2 underground fuel tanks Supports data center at maximum load for 14 days without refueling 24/7/365 emergency service and maintenance by certified contractors
.Environmental Control  
 
N+1 Redundant chillers High efficiency Liebert chilled water A/C units Data center environment maintained at optimal temperature and humidity levels 24/7/365 HVAC emergency service and maintenance by certified contractors
.Fire Protection  
 
 
Highly sensitive VESDA smoke detection alarm system 24/7/365 Temperature monitoring FM200 Chemical fire suppression system
 
 
  2/15/2008
Generator test Friday
There will be a generator test performed at 6am on Friday, October 26th.
The test will consist of turning off utility power to the facility and testing the generator turn-on and switchover. Once the test is complete, normal utility power will be restored.
The switchover is expected to take no more than 2 minutes if all goes well. If the switchover should not occur properly, then utility power will be restored immediately.
This is just an informational message to inform you of the power test. No action needs to be taken on your part.

 
 
2/13/2008
WARNING TO SPAMMERS
In the last few weeks we have been getting a lot of signups for servers where clients are trying to use them in order to send spam emails out. WE DO NOT ALLOW THIS PRACTICE AND AT THE FIRST COMPLAINT OF SPAM COMING OUT OF ANY OF OUR SERVERS WE WILL SHUT THE SERVER DOWN WITHOUT WARNING!.
 
 
 
Home |
 
 
 
Premiere Vendor in the Fort Lauderdale, Florida Web Site Hosting Provider, Domain Hosting Provider Directory at Marketingtool.com.